|
|
|
FIRST POINT OUTFALL
|
|||||||||
|
Click the photograph for a enlarged view |
Future Developments No upgrades were proposed at the time of writing since the hydraulic capacity of the system was considered adequate for medium term projections (until 2021 - K. Tomlinson pers. comm.).
|
||||||||||
|
First Point |
(Firs_4) Last updated June 2000 |
||||||||||